General Electric:
- Commissioning tests of all Protection and Controls at DeKoven substation also includes relay/communication scheme upgrades at several remote sites, Chicago, IL
Abbott Labs:
- Several Utility Locating Projects at all of their Lake County sites, North Chicago, IL
Clarion Realty:
- Diagnostic testing of Automatic Transfer Switch problems at the Caremark Towers facility, Northbrook, IL
- Infrared Survey of 600 North Michigan and the Caremark Towers Facility.
Hines Interest:
- Maintenance Testing of Automatic Transfer Switches at the One Pierce Place facility, Itasca, IL.
Kelso-Burnett Company:
- Acceptance Testing of the 34 KV to 12 KV Washington Street Substation, including multifunction relays, transformers, and MV vacuum type breakers, Naperville, IL.
- Fiber Line communications testing and commissioning using an optical time domain reflectometer – Raymond Street Substation, Naperville, IL.
Hewitt Associates, LLC:
- Acceptance and Maintenance testing of Circuit Breakers and Switchgear with Infrared Testing, Lincolnshire, IL
Kraft Foods:
- Power Quality Analysis and Infrared Testing, Glenview, IL
Aldridge Electric:
- Acceptance Testing of Generator switchgear, Lake County, IL
Central DuPage Hospital:
- Utility Locating services, Infrared survey, and Power Quality Analysis, Winfield, IL
Federal Reserve Bank of Chicago:
- Utility Locating services, Infrared survey, and Power Quality Analysis, Chicago, IL
|